Report prepared immediately after the event

 

Machine time:

1300 hours on ME29 – 35

Senior analyst / Programmers man/weeks:

62

Other Programmers – man/weeks:

26

Design work started in Feb. 81, programming ; in March, testing in mid-Aparil. Everyti~ing was operational by beginning of July. Operators were trained during July, cup finals were August 15th and 16th, for 3 hours each day.

Number of programs written
(TP programs between 1500 – 2100 COBOL source lines)

60 (20 TP programs + 40 batch)

Number of various parameter sets written

40 (including DDE format programs)

Configuration

· ME29 – 35/2, 512 Mbyte

· 4 x MD5 20 disc drives ( 2 drives actually used)

· 1 x PBS 720 line printer

· 2 x matrix printers

· 24 x workstation

· 1 x 7502 remote terminal with 1 x VT and 1 x HCP

Distribution of the terminals

Computer control room

- 4 workstations + PBS on the first day

- 4 workstations + P8S + 7502 with 2xVT and l x HCP on the second day

Stadium

- 6 workstations

Call room

- 1 workstation

Stadium semaphore

- 1 matrix printer

TV

- 2 workstations

Press centre (stadium)

-1 workstation

- 1 matrix printer

Press centre (in the town)

- 7502 remote terminal controller with 1 x VT and 1 x HCP (during the first day)

 

Software used

· TME 30 + M.AC

· 2903 COBOL

· MTS

· DDE

People involved in design and running the system

Consultant on athletics:

Mr. Zoran Vrbanac, secretary of Athletic federation of Croati.a.

Project management design and programming (TP and batch):

Mr. Radomir Vukina, Mladost, support manager (Zagreb area)

Message router and TP programming, TME settings:

Mr. Milan Matić., Mladast, support manager (Belgrade area)

TP programming supervision of junior programmers:

Mrs. Mila Mikić, ICL Yugosiavia

Testing, batch and TP programs, training and supervision of the operations staff:

Mr. Darko Špehar, Mladost, DP department

Testing batch programs:

Mrs . Ljilja Obradović, Mr. Božo Tojagić, Mr. Tugomi.r Popović , Miss Ksenija Krnajski - programmers from Mladost DP department, just back from their COBOL course (all are experienced ICL System Ten users, but it was their first contact with ME29).

0perations:

Console operator: Mr. Andrija Habrka, from Mledost DP department, who was also in charge of all admin. work during the AKE project)

Terminal operators:

12 data prep. operators from various users

People involved in hardware:

Project management:

Mr. Veljko Mudrinić, Mladost, maintenance supervisor

Engineers:

Mr. Denis Lobo, ICL

Mr. Rade Matović, Mr. Ivan Špelić, Mr. Duško Savatović, Mr. Branislav Filipović, Mr. Srećko Brezak, - all from Mladast maintenance

Import administration:

Mrs. Nada Gol, Mladost consignment store

Engineering coordination in ICL:

Mr. Allan Taylor

Overall management for the computer project:

Mr. Branko Sviben, assistant director Mladost IZ

Management for all Mladost operations:

Mr. Živko Marušić , director, Mladost admin.

Major obstacles:

· importing the ME29

· finding temporary locations

· moving and installing the machine 3 times

· a nasty software bug in TME

We had to Iearn how to:

· write COBOL programs (batch and TP)
(Mila and Milan knew how to write batch programs, other had not known even that)

· write MTS router

· use ME29

· use MAC

· use all rules for athletics

We started to work with stolen manuals, some of them were replaced with ones properly ordered, some are still missing.

For additional information
If you want to find more about BCC Services, our services and products, please visit us: BCC Services d.o.o., Damira Tomljanovića 7, 10000 Zagreb, Croatia ; or call us: +385 (1) 30-37-600 ; send us a fax: +381 (1) 30-37-699 ; or send us an e-mail to: info@bccservices.com

 Contact us     Legal 

All Rights Reserved, Copyright © BCC Services d.o.o.; 1998 - 2018