prepared immediately after the event
Machine time: |
1300 hours on ME29 – 35 |
Senior analyst / Programmers man/weeks: |
62 |
Other Programmers – man/weeks: |
26 |
Design work started in Feb. 81, programming ; in March,
testing in mid-Aparil. Everyti~ing was operational by
beginning of July. Operators were trained during July, cup
finals were August 15th and 16th, for 3 hours each day.
Number of programs written
(TP programs between 1500 – 2100 COBOL source lines) |
60 (20 TP programs + 40 batch) |
Number of various parameter sets written |
40 (including DDE format programs) |
Configuration
· ME29 – 35/2, 512 Mbyte
· 4 x MD5 20 disc drives ( 2
drives actually used)
· 1 x PBS 720 line printer
· 2 x matrix printers
· 24 x workstation
· 1 x 7502 remote terminal with 1
x VT and 1 x HCP
Distribution of the terminals
Computer control room |
- 4 workstations + PBS on the first day
- 4 workstations + P8S + 7502 with 2xVT and l x HCP
on the second day |
Stadium |
- 6 workstations |
Call room |
- 1 workstation |
Stadium semaphore |
- 1 matrix printer |
TV |
- 2 workstations |
Press centre (stadium) |
-1 workstation
- 1 matrix printer |
Press centre (in the town) |
- 7502 remote terminal controller with 1 x VT and 1
x HCP (during the first day) |
Software used
· TME 30 + M.AC
· 2903 COBOL
· MTS
· DDE
People involved in design and running the system
Consultant on athletics:
Mr. Zoran Vrbanac, secretary of Athletic federation of
Croati.a.
Project management design and programming (TP and batch):
Mr. Radomir Vukina, Mladost, support manager (Zagreb area)
Message router and TP programming, TME settings:
Mr. Milan Mati ć.,
Mladast, support manager (Belgrade area)
TP programming supervision of junior programmers:
Mrs. Mila Miki ć,
ICL Yugosiavia
Testing, batch and TP programs, training and supervision
of the operations staff:
Mr. Darko Špehar, Mladost, DP department
Testing batch programs:
Mrs . Ljilja Obradovi ć,
Mr. Božo Tojagić,
Mr. Tugomi.r Popović
, Miss Ksenija Krnajski - programmers from Mladost DP
department, just back from their COBOL course (all are
experienced ICL System Ten users, but it was their first
contact with ME29).
0perations:
Console operator: Mr. Andrija Habrka, from Mledost DP
department, who was also in charge of all admin. work during
the AKE project)
Terminal operators:
12 data prep. operators from various users
People involved in hardware:
Project management:
Mr. Veljko Mudrini ć,
Mladost, maintenance supervisor
Engineers:
Mr. Denis Lobo, ICL
Mr. Rade Matovi ć,
Mr. Ivan Špelić,
Mr. Duško Savatović,
Mr. Branislav Filipović,
Mr. Srećko
Brezak, - all from Mladast maintenance
Import administration:
Mrs. Nada Gol, Mladost consignment store
Engineering coordination in ICL:
Mr. Allan Taylor
Overall management for the computer project:
Mr. Branko Sviben, assistant director Mladost IZ
Management for all Mladost operations:
Mr. Živko Maruši ć
, director, Mladost admin.
Major obstacles:
· importing the ME29
· finding temporary locations
· moving and installing the
machine 3 times
· a nasty software bug in TME
We had to Iearn how to:
· write COBOL programs (batch and
TP)
(Mila and Milan knew how to write batch programs, other had
not known even that)
· write MTS router
· use ME29
· use MAC
· use all rules for athletics
We started to work with stolen manuals, some of them were
replaced with ones properly ordered, some are still missing. |